This page describes ongoing operation after handover. The surface your people work in is SAIP; what happens during a failure is under reliability.
Handover as the Final Deployment Phase
Phase 5 of the deployment methodology is handover: operations team training, documentation handover, and formal operational acceptance. The SynapSync team remains available for support, but the system operates under full customer control from this point on — that's not a formality, it's the moment responsibility actually transfers.
What Day-to-Day Operation Looks Like
In ongoing operation, the Neuronal Core monitors continuously, classifies anomalies, and either executes autonomously or flags for review — depending on the boundaries configured in the autonomy engine. Operators see system state, anomaly alerts, and responses through local operational interfaces; none of it leaves the system perimeter through administrative channels.
Maintenance Without Unplanned Outages
The aim of this phase is that maintenance events are planned and executed within windows the Neuronal Core identifies in advance, instead of being forced by a failure. That is the direct result of combining anomaly detection with the operational processes handed over in Phase 5.